Software FAQs
Can I copy data between files in PHAWorks Lite?
To help maintain consistency between projects and/or to ensure the accuracy of information on studies of the same facility, Primary Level (e.g. Nodes), Secondary Level (e.g. Parameters), worksheet entries, drawings, procedures, quick entry lists, reports, worksheet views, and other data can be copied between projects.
Copy From Other Project can be accessed from from the Tools menu.
Protocols, QC Checklists, Quick Entry Lists, Primary Level (e.g., Nodes), Worksheet Views, and Reports can also be copied from using the context menu in the respective features.
- Copy Quick Entry Lists From Other Project
- Copy Primary Level (e.g., Nodes) From Other Project
- Copy Worksheet Views From Other Project
- Copy Reports From Other Project
To copy data, open the project coping data into. The project in which the data is being coped from cannot be open, nor can it be a different template or the same template but different configuration. For example, data cannot be copied from a What-If project into a HAZOP project or from a What-If study without Subsystems into a What-If study with Subsystems.
All Quick Entry Lists, Primary Level (e.g., Nodes), and Reports are appended into the project being copied into. Items that are tagged (e.g., drawings used) will be copied.
Dialogs displayed during the wizard may vary based on selection of items.
Example image for Copy From Other Project.
Related Topics
- How does the export feature work in PHAWorks Lite?
- How do I generate reports in PDF, HTML, Excel and Word in PHAWorks Lite?
- PHAWorks Lite Help
- Are safeguard and recommendation entries linked in PHAWorks Lite?
- What defaults templates are available in PHAWorks Lite?
- Can I copy data between files in PHAWorks Lite?
- What are Quick Entry lists in PHAWorks Lite?
- How do I perform LOPA in PHAWorks Lite